Lifting of the steel structure of the Tower No. 11
09.11.17
We are proud to announce that once again we received an order from ZANEM on lifting the steel structure of Tower No. 11, located on the premises of Zakład Hydrotechniczny, belonging to KGHM PM SA.
The order will be divided into 3 stages during years 2017-2018.
Weight of the structure is 80 tons.
ul. Kopalniana 9
(biurowiec Pol-Miedź Trans)
Skr. poczt. nr 91
59-101 Polkowice
NIP: 5020109263
REGON: 021935243